CPS completed electrical installations for both temporary and permanent effluent decontamination systems on an active campus. The temporary setup included all required infrastructure, while the permanent system featured enclosed circuit breakers, wire troughs, and full support components. Work included selective demolition and system upgrades, adding a transformer, UPS, and updated panels. All work complied with EM 385-1-1, OSHA, ANSI, NEC, NFPA, and applicable regulations, with safety emphasized throughout the occupied site.

Contract Amount: $126,000